WWW.ALLANHOMES.COM







Sep 17, 2007
Lot 27 is Complete

Lot 27 is finished now and ready to be moved into, well as soon as it is cleaned. I really like the stone with the exterior colors that were chosen. Here are some photos of the exterior of the home. I will post some pictures of the inside as soon as the cleaning is complete.

 

 


Posted at 04:55 pm by Don Lindsay
Make a comment  

Aug 23, 2007
Lot 4 Foundation

Here is a picture of lot 4. The rain over the last couple days has kept me from putting on the waterproofing  but it should finally be dry enough tomorrow. I will post more pictures tomorrow afternoon.

 


Posted at 02:59 pm by Don Lindsay
Make a comment  

Aug 20, 2007
Logans Run Lot 4

Logans Run Lot 4 is now under Construction! The home is a Greenwood model. Here is a picrure taken of the excavation for the basement. More updates on this home will come in the next couple days.

Posted at 10:46 am by Don Lindsay
Make a comment  

Lot 27 Interior Pictures

I took a few picture of the interior on lot 27 to post on here. This home is a Carlisle model. It is hard to get a feel for the flooring with the protective covering down but better safe than sorry!

 

Above is a picture of the Sunroom and the Breakfast area.

Here is a look at the Master Bedroom and entry to the Master Bath.

The Breakfast Room and Kitchen area looking from the Family Room.

The last one for today is of the Dining Room taken from the Foyer.

 

 

More pictures to be posted soon. Stay Tuned.


Posted at 10:29 am by Don Lindsay
Make a comment  

Lot 23 Update

When we last saw lot 23 in Logan's Run it was still in its early stages of framing. Now it has siding most of the exterior trim, electric,plumbing and is going into drywall this week. This week also includes the septic and well installation. More updates to come on this great home.

Posted at 10:22 am by Don Lindsay
Make a comment  

Logan's Run Update Lot 27

Well it's been way too long since the last update. Logan's Run is certainly starting to take shape and with that comes much more to do. I will try to do a better job at keeping this blog updated at least once a week. Lot 27 is about 3/4 complete now and really moving along nicely. The stone and the siding really look nice. We are still waiting on a few shutters and loose ends but what a difference a couple weeks make. This week is the septic and well installation as well as final grading of the yard.

 


Posted at 10:13 am by Don Lindsay
Make a comment  

Jul 23, 2007
Lot 23 Ready for windows and Roof Shingles

Lot 23 is really coming along very nicely. Windows and roof shingles are scheduled for Install early this week and then we will start the heating and air rough ins as well as the plumber. Thanks for the comment, I am glad to post pictures of your home as progress continues. The next week or so should be an exciting week of progress.

 


Posted at 09:52 am by Don Lindsay
Make a comment  

Jul 18, 2007
Lot 23 Progress Pictures

Directly across the street from the model home is Lot 23. A Greenwood is being built on that lot for a family from New York. It will have many of the features of the model home including a Sun Room, Side Entry Garage, Large Front Porch and Finished Basement. This home should look very nice as it gets closer to being completed. Here is a picture of that home in its early stages of framing.

 


Posted at 01:59 pm by Don Lindsay
Comment (1)  

Jul 14, 2007
The Dover Model

The Dover Model at Logan's Run has been getting quite a bit of interest so for those who can not see it locally I thought I would post a few pictures of the interior of the Home.

 

Here is a picture of the Large Soaking tub and the separate shower with seat in the Master Bath.

 

This is picture of the Large Gourmet kitchen in the Dover complete with Wall oven and Cook top.


Posted at 01:36 pm by Don Lindsay
Make a comment  

Jul 12, 2007
Model Home Pictures

I have received various comments asking me to post more pictures of my Model at Logan's Run. Let me first say that the Model Home is open Wed - Sun from AM - PM and by appointment anytime. It is a Carlisle Model and is fully decorated.This first picture is of the Family room fireplace taken from the living room. The second picture is the Breakfast room and Optional Sun room. Be sure to check out the virtual tour on our website www.allanhomes.com  .

 

 


Posted at 01:25 pm by Don Lindsay
Make a comment  

Previous Page Next Page

<< October 2009 >>
Sun Mon Tue Wed Thu Fri Sat
 01 02 03
04 05 06 07 08 09 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31



Model Hours
Fri - Tues 10AM - 5PM
Phone 302-424-0660


The Greenwood

The Carlisle

The Santa Cruz

The Franklin

The Dover

The Adams

The New Castle

The York

If you want to be updated on this weblog Enter your email here: